Weekly Update: Bypass Construction

Entry Time Span: All ( 17 posts )
 
 
 

As the construction season comes to a close, crews are conducting cleanup and winter preparation. Updates will continue when construction restarts in the spring.

Read More >>

Work completed this week Brett Drive Installation of water main Installation of services Installation of hydrant Installation of sanitary pipe Installation of manhole Water pressure testing Backfill and compaction Installation of concrete curb Upcoming tasks Installation of curb Installation of sanitary pipe Backfill and compaction Concrete forming

Read More >>

Work completed this week Brett Drive Installation of sanitary pipe Installation of manhole Installation of water main Installation of services Backfill and compaction Bussieres Drive Adjusting valves and manholes Backfill and compaction Upcoming tasks Installation of sanitary pipe Backfill and compaction Concrete prep and pouring

Read More >>

Work completed this week Brett Drive Installation of water main Installation of storm pipe Installation of sanitary pipe Installation of services Installation of manhole Backfill and compaction Bussieres Drive Pressure testing of water main Backfill and compaction Upcoming tasks Installation of sanitary pipe on Brett Drive Backfill and compaction

Read More >>

Work completed this week Brett Drive Installation of storm pipe Installation of adapters Installation of manhole Asphalt removals and pre-cut Bypass pumping Installation of three services Installation of temp water Bussieres Drive Installation of sanitary pipe Installation of water main Installation of valve Backfill and compaction Upcoming tasks Installation of sanitary pipe and insulted storm pipe Backfill and compaction

Read More >>

Work completed this week Brett Drive Installation of insulated storm pipe Installation of sanitary pipe Installation of water main Installation of valves, services and a tee Installation of a hydrant Backfill and compaction Bussieres Drive Installation of sanitary pipe Installation of water main Installation of a manhole Backfill and compaction Upcoming tasks Installation of insulated storm and sanitary pipe Backfill and compaction

Read More >>

Work completed this week Brett Drive Installation of sanitary pipe Installation of residential services Installation of sanitary manhole Backfill and compaction Bussieres Drive Installation of sanitary pipe Installation of hydrant Installation of valves Raising and adjustment of manholes Installation of water main and water main pressure testing Installation of residential services Backfill and compaction Upcoming tasks Continuation of water main installation, backfill and compaction

Read More >>

Work completed this week: Brett Drive Installation of sanitary pipe Installation of water main Installation of sanitary manhole Installation of four residential services One commercial service connected Base preparation, backfill and compaction Priming gravel in preparation for asphalt paving from Brett to Brett/Barber intersection Asphalt paving from Brett to Brett/Barber intersection (two lifts) Bussieres Drive Installation of sanitary pipe Installation of manhole Installation of water main Installation of valve Installation of 19 residential services Pre-cut as well as water main, valve, and reducer installation Upcoming work Continuation of installation of sanitary pipe, pre-cut and backfill on Brett Drive Continuation of installation of water main, sanitary pipe and backfill on Bussieres Drive

Read More >>

Work Completed this Week Brett Drive Backfill and compaction along Barber Drive Concrete curb layout and forming Installation of manhole and sanitary pipe Service connections Bussieres Drive Pre-cut of Bussieres corner Pump move and reestablishment Installation of sanitary pipe Upcoming work Base prep along Brett Drive to the Brett Drive/Barber Drive intersection Sanitary pipe installation on Brett Drive and Bussieres Drive Backfill, compaction and manhole installation on Bussieres Drive

Read More >>

Work completed this week: Brett Drive Backfilling and compaction Concrete pour and stabilization Installation of sanitary pipe Installation of a 200mm water valve Installation of slip collar, tee, reducer and 6m pipe Bussieres Drive Excavation Installation of sanitary pipe Installation of a 1500mm manhole Upcoming work Compaction on Brett Drive Pre-cut and excavation along Barber Drive to Brebeuf intersection Installation of sanitary pipe on Bussieres Drive Backfill excavation on Bussieres Drive

Read More >>

Work Completed This Week Brett Drive Backfilling and compaction Excavation Installation of pipe Bussieres Drive Excavation Installation of a new pump system Installation of pipe Upcoming work Backfilling and compaction Excavation Installation of pipe

Read More >>

Work completed this week Brett Drive Backfilling: 135 Brett Drive to 139 Brett Drive Pipe installation: 134 Brett Drive to intersection of Brett Drive and Barber Drive Bussieres Drive Installation of new pipe system at intersection of Bussieres Drive and Berard Crescent. Backfilling where necessary Installation of new pump system Upcoming work Finish installation of pump system

Read More >>

Work Completed This Week Continue testing of the installed sewer. Various driveway repairs and cleaning. Temporary sidewalk repair with asphalt. Paving on Brett Drive at the location of the water main repair. Temporary gravel trail from Berard Crescent to Brett Drive was constructed. General site cleanup and street sweeping. Started cleanup of laydown area near Brett Drive; panel fencing taken down and erosion control devices installed. Started line painting. Berm installed at Brett Drive behind bus shelter to mediate drainage issues. Continued correcting minor manhole deficiencies. Work Anticipated Next Week General site cleanup and removal of construction materials from site. Final street sweeping. General site grading. Final installation of required erosion control devices. Replaced wood fences at Berard Crescent and ...

Read More >>

Work Completed This Week Permanent paving on Brooks Place, Bussieres Drive and Barber Drive was conducted (less a small section on Brett Drive). Water service repair on Brett Drive completed by Underground Services (UGS). UGS completed backfilling of the area. The backfilled area will become part of the 2016 project scope to ensure compaction meets the project specification. Panel fencing removed from Brett Drive and Bussieres Drive. Continued testing of the installed sewer. Replaced temporary connections from the old sanitary system to the new sanitary system with a more permanent-type connection until project restart in 2016. Continued correcting minor manhole deficiencies (safety step alignment, grade adjustments, flow control gates, etc.) Temporary water lines at Brett Drive and Bussieres Drive ...

Read More >>

Work Completed This Week Bussieres Drive is now ready for asphalt surfacing. First lift of asphalt on Brooks Place is complete. Remaining first lift of asphalt placed on Brett Drive. Paving complete on Barber Drive. Temporary water connected to all homes on Brett Drive and Bussieres Drive. Continued testing of installed sewer. Completed all concrete curb repairs on Brosseau Crescent, Brooks Place and Brett Drive. Completed all concrete sidewalk repairs. Started various trail reinstatements. Installed erosion control devices around topsoil stockpiles. Corrected minor manhole deficiencies (safety step alignment, grade adjustments, flow control gates etc). Work Anticipated Next Week Replace temporary connections from the old sanitary system to the new sanitary system with “permanent” (over-the-winter) connections. Repair damaged catch basin lateral ...

Read More >>

Work Completed This Week Finished backfilling excavated areas on Barber Drive and preparing for asphalt surfacing. Continue backfilling excavated areas on Bussieres Drive. Preparing Brett Drive for asphalt surfacing. Preparing Brooks Place for asphalt surfacing. Started grading in greenspace behind Brosseau Crescent to ensure proper drainage. Cleanup and grading around the playground and community garden. Preparation for testing of the installed sewer. Temporary water service lines installed for sections of Brett Drive and Bussieres Drive. Temporary water is not in effect yet. Commencement of concrete repair in the Brooks Place and Brosseau Crescent area as well as the Brett Drive and Burns Place intersection. Site cleanup Work Anticipated Next Week Continue backfilling excavated areas on Bussieres Drive and prepare for ...

Read More >>

Work Completed This Week The Canada Post mailbox on Brosseau Crescent has been returned to its original location. The contractor has started backfilling the holes caused by utility locates. The sidewalk on the south side of Brett Drive has been prepared for asphalt surfacing. The contractor has commenced backfilling excavated areas on Barber Drive. The contractor has commenced backfilling excavated areas on Bussieres Drive. Brett Drive is being prepared for asphalt surfacing. Silt fence (an erosion control device) is being repaired. General site cleanup. Work Anticipated Next Week The contractor will connect some residents on Brett Drive and Bussieres Drive to a temporary water supply. All homes in the affected area will receive a written notice providing more detailed information. ...

Read More >>