Project
|
Neighbourhood
|
Status
|
Pumphouse Membrane Replacement & Optimization
|
Abasand
|
Oh Hold
|
Abasand Columbarium
|
Abasand
|
Active
|
Abasand Underground Infrastructure Assessment
|
Abasand
|
Active
|
Active Transportation Phase 2
|
Fort McMurray
|
Active
|
Active Transportation Phase 3 - Design
|
Fort McMurray
|
Active
|
Albion Drive Full Rehabilitation
|
Abasand
|
Active
|
Basketball Court Replacements
|
Multiple locations
|
Complete
|
Greenspace Restoration
|
Beacon Hill
|
Substantially
Complete
|
Bear Paw Playground Restoration - Design
|
Timberlea
|
Complete
|
Birchwood Trails Bridge Rehabilitation
|
Thickwood/Timberlea
|
Substantially
Complete
|
Cemetary Expansion - Design
|
Abasand
|
Active
|
Chemical Storage Facility
|
Fort McMurray
|
Substantially
Complete
|
Christina Gordon School Inclusive Playground
|
Parsons Creek
|
Substantially
Complete
|
Clearwater Park System (Riverside Park System) - Remediation
|
Fort McMurray
|
Substantially
Complete
|
Compost Facility Stockpile Repairs
|
Fort McMurray
|
Complete
|
Confederation Way Sanitary Sewer Phase 2 - Construction
|
Fort McMurray
|
Substantially
Complete
|
Deep Utilities and Culvert Rehabilitation - Construction
|
Fort McMurray
|
Active
|
Disc Golf Design (SOC and Lions Club)
|
Fort McMurray
|
Active
|
Downtown Parking Lot - Design & Construction
|
Fort McMurray
|
Substantially
Complete
|
|
|
|
Drainage Improvements (schools and tot park)
|
Parsons Creek/Brett Drive
|
Active
|
Drainage Improvements (Playgrounds & Outdoor Fitness Modules)
|
Fort McMurray
|
Active
|
Father Mercredi Street - Site Remediation
|
Fort McMurray
|
Active
|
Flood Mitigation - Design
|
Fort McMurray
|
Active
|
Flood Mitigation - Reaches 1, 2, 9 Enhancements - Design
|
Fort McMurray
|
Active
|
Flood Mitigation - Reaches 3 Enhancements - Design
|
Fort McMurray
|
Active
|
Flood Mitigation - Reaches 4 Enhancements - Design
|
Fort McMurray
|
Active
|
Flood Mitigation - Reach 5
|
Fort McMurray
|
Active
|
Flood Mitigation - Reach 6 - Design
|
Fort McMurray
|
Active
|
Flood Mitigation - Reach 7
|
Fort McMurray
|
Complete
|
Flood Mitigation - Reach 8
|
Fort McMurray
|
Substantially
Complete
|
Flood Mitigation Reach 10-1
|
Fort McMurray
|
Substantially Complete
|
Flood Mitigation Reach 10-2 - Design
|
Fort McMurray
|
Active
|
Flood Mitigation Reach 11
|
Fort McMurray
|
Substantially
Complete
|
Flood Mitigation - TaigaNova North - Construction
|
Fort McMurray
|
Active
|
Flood Mitigation - Underground Enhancements
|
Fort McMurray
|
Active
|
Flood Mitigation - Seasonal Mitigation
|
Fort McMurray
|
Active
|
Grayling Terrace Drainage - Construction
|
Fort McMurray
|
Complete
|
Green Gym Drainage
|
Fort McMurray
|
Complete
|
Gregoire Storm Outfall Structure - Construction
|
Fort McMurray
|
Active
|
Gregoire Skate Park
|
Fort McMurray
|
Active
|
Ground Penetrating Radar
|
Fort McMurray
|
Active
|
Hospital Street Infrastructure Assessment
|
Fort McMurray
|
Active
|
Irrigation Repairs
|
Fort McMurray
|
Active
|
Landfill Closure Cells 1-3, Lateral Expansion and Old Landfill
|
Fort McMurray
|
Active
|
Water Treatment Plant - Crossflow Clarifier Life Cycling - Construction
|
Fort McMurray
|
Active
|
Water Treatment Plant Process Improvement Design & Construction
|
Fort McMurray
|
Active
|
Water Treatment Plant Overflow Piping Isolation
|
Fort McMurray
|
Active
|
Inclusive playground components replacements and additions
|
Eagle Ridge, Dickinsfield, Downtown
|
Substantially Complete
|
King Street Booster Rehabilitation-Construction
|
Fort McMurray
|
Substantially Complete
|
Memorial Park Signs - Pre-Design
|
Fort McMurray
|
Active
|
Moccasin Flats Memorial
|
Fort McMurray
|
Active
|
New Standpipe Facilities - Borealis Park
|
Fort McMurray
|
Active
|
Northside Twin Arena - Design & Construction
|
Dickinsfield
|
Active
|
Outdoor Rink Asphalt Surface Upgrade
|
Waterways
|
Complete
|
OHV Feasibility Study
|
Fort McMurray
|
Active
|
Partial Playground Replacement (Westview and St. Kateri)
|
Thickwood/Eagle Ridge
|
Active
|
Pedestrian Bridge Assessment/Design
|
Fort McMurray
|
Active
|
Playground Replacements (Dr. Clark and Ecole Boreal)
|
Abasand
|
Active
|
2024 Playground Replacement - Design
|
Fort McMurray
|
Active
|
Perimeter Trail - Design
|
Prairie Creek
|
Active
|
Public Works North Facilities
|
Fort McMurray
|
Active
|
Reflections Lookout - Construction
|
Beacon Hill
|
Active
|
Road Surface and Alleyways Improvement
|
Thickwood/Abasand
|
Active
|
Rose Bay Retaining Wall Repair
|
Thickwood
|
Active
|
Ryan/Hodgson Memorial Park - Design
|
Beacon Hill
|
Complete
|
SAP Functional Improvements - Drainage
|
Fort McMurray
|
Active
|
SAP Parks Improvements - Design
|
Fort McMurray
|
Complete
|
Saunderson Pressure Reducing Value PRV - Construction
|
Fort McMurray
|
Active
|
Silin Forest Road Deep Utilities Upgrades - Construction
|
Thickwood
|
Active
|
Site Drainage Improvement Program - Design & Construction
|
Fort McMurray
|
Substantially Complete
|
Snye Dredging
|
Fort McMurray
|
Active
|
Snye Weed Harvesting
|
Fort McMurray
|
Active
|
Solid Waste Master Plan - Phase 2
|
Fort McMurray
|
Active
|
Southeast Pumphouse 3rd Pump Installation
|
Fort McMurray
|
Active
|
Spray Park Surface Drainage - Howard Pew
|
Fort McMurray
|
Active
|
Spray Park Replacement Program - Design Build - KP Wong
|
Fort McMurray
|
Active
|
Spray Park Replacement Program - Design Build - Wood Buffalo
|
Fort McMurray
|
Active
|
Spray Park Replacement Program-Design Build-Lakewood
|
Fort McMurray
|
Active
|
Standpipe - Borealis Pond
|
Fort McMurray
|
Active
|
Stone Creek Disk Golf
|
Eagle Ridge
|
Substantially Complete
|
Storm/Sewer/Water Upgrades in Mackenzie/Beacon Hill - Design
|
Beacon Hill
|
Active
|
Storm/Sewer/Water Upgrades in Mackenzie/Beacon Hill - Construction
|
Beacon Hill
|
Complete
|
Stormwater Drainage Improvement - Construction
|
Fort McMurray
|
Active
|
Thickwood Perimeter Sewer - Phase 1 - Construction
|
Thickwood
|
Substantially
Complete
|
Thickwood Perimeter Sewer - Design
|
Thickwood
|
Active
|
Timberlea Community Park - Assessment & Re-design
|
Timberlea
|
Active
|
Timberlea Community Park Light Pole (Trail)
|
Timberlea
|
Active
|
Reservoir & Pumphouse - Design & Construction
|
Timberlea
|
Active
|
Transit Facility (Green TRIP)-Construction
|
Fort McMurray
|
Substantially Complete
|
Urban Arterial Boulevard Improvements & Beautification
|
Fort McMurray
|
Active
|
Urban Infrastructure Rehabilitation Design 2019-2021
|
Fort McMurray
|
Active
|
TaigaNova/Abasand Lift Station Infrastructure Structural Modifications
|
Fort McMurray
|
Active
|
Wastewater Treatment Plant - Arc Flash Study
|
Fort McMurray
|
Complete
|
|
|
|
Wastewater Treatment Plant - Lagoon Desludging
|
Fort McMurray
|
Active
|
Wastewater Treatment Plant - Leaky Walls Assessment
|
Fort McMurray
|
Active
|
Wastewater Treatment Plant - Process Improvements Design
|
Fort McMurray
|
Active
|
Wastewater Treatment Plant - Vegetation Removal
|
Fort McMurray
|
Active
|
Water Treatment Plant - Valve Chamber #2
|
Fort McMurray
|
Active
|
Water Treatment Plant Overflow Piping Isolation - Design
|
Fort McMurray
|
Active
|
Water Treatment Process Improvement - Phase 1 Design & Construction
|
Fort McMurray
|
Active
|
Water Treatment Process Improvement - Phase 2 Design & Construction
|
Fort McMurray
|
Active
|
Waterfront Park
|
Fort McMurray
|
Active
|
|
|
Active
|
Lift Station Replacement - Design & Construction
|
Wood Buffalo
|
Active
|
Wood Buffalo Lift Station Replacement - Design
|
Fort McMurray
|
Active
|
|
|
|