Saprae Creek Mailbox/Intersections Beautification Project
Introduction:
The Regional Municipality of Wood Buffalo is preparing to complete the beautification project in the Saprae Cree/Spruce Valley Drive area. The scope of work involves the reconstruction of the current mailbox area, drainage improvements, beautification of intersections, and signage installation.
Map:
Project location
Temporary mailbox location and laydown yard.
Proposed Start and End Dates:
August 11, 2025 -October 31, 2025
Contractor:
H.Wilson Industries (2010) Ltd.
Lead Department:
Project Management Office
Project Details:
The project includes the temporary relocation of mailboxes to perform the reconstruction and beautification of the existing mailbox area. This includes drainage improvements, followed by a new cover structure construction and surface area improvements. Additional work will include signage, fencing replacement, bollard installation, landscaping, and hardscaping at the mailbox access area, as well as multiple intersections as shown in the map above. Except for the temporary mailbox relocation, there won’t be any other interruptions to your services.
All dates and timelines outlined are approximations of when the work may be taking place in this area. Access to the work area may be required throughout the project area at any time.
H. Wilson will adhere to applicable noise and disturbance bylaws. Timelines are subject to change based on weather, equipment and other unforeseen factors.
Community Benefit:
As the various phases of construction are completed, affected portions of Saprae Creek/Spruce Valley Drive will be restored and improved. At the completion of the project, the impacted portion(s) of the road will see a substantial improvement, aligning with the Municipality’s commitment to infrastructure improvements and beautification.
Construction Impacts:
☐Temporary Water/Sewer
☒Parking & Vehicle Access
☐Garbage Pick Up
☐Driveway Interruption
☐Sidewalk Closure
☒Mailbox Relocation
☒Road or Lane Closure
☒Laydown Yard
☐Transit
☐Other
Special Instructions for Residents:
Pedestrian access within construction zones may be limited. Residents may see traffic delays to complete certain aspects of the work. The sections under construction will be flagged during the regular work hours, when needed; however, the roads are to remain open to traffic.
Signage will be in place for each phase of construction.
Emergency access will be maintained at all times in the event of an emergency.
For your safety and the safety of construction crews, please keep away from heavy equipment and obey all signage.
For more information, please contact Pulse at 780-743-7000 or 1-800-973-9663. You can also visit rmwb.ca/construction and subscribe for updates directly to your inbox.
Contact Us
PULSE
Submit a request
Phone: 780-743-7000
Toll free: 1-800-973-9663
Subscribe for RMWB updates
Stay up to date on the services, programs and projects in your neighbourhood!