Project | Neighbourhood | Status |
Pumphouse Membrane Replacement & Optimization |
Abasand |
Active |
Active Transportation Phase 2 |
Fort McMurray |
Active |
Active Transportation Phase 3 |
Fort McMurray |
Active |
Albion Drive Full Rehabilitation |
Abasand |
Active |
Basketball Court Replacements |
Multiple locations |
Complete |
Greenspace Restoration |
Beacon Hill |
Substantially
Complete
|
Bear Paw Playground Restoration - Design |
Timberlea |
Active
|
Birchwood Trails Bridge Rehabilitation |
Thickwood/Timberlea |
Substantially
Complete
|
Cemetary Expansion - Design |
Abasand |
Active
|
Chemical Storage Facility |
Fort McMurray |
Substantially
Complete
|
Christina Gordon School Inclusive Playground |
Parsons Creek |
Substantially
Complete
|
Clearwater Park System (Riverside Park System) - Remediation |
Fort McMurray |
Substantially
Complete
|
Compost Facility Stockpile Repairs |
Fort McMurray |
Complete |
Confederation Way Sanitary Sewer Phase 2 - Construction |
Fort McMurray |
Substantially
Complete
|
Deep Utilities and Culvert Rehabilitation - Construction |
Fort McMurray |
Active |
Downtown Parking Lot - Design & Construction |
Fort McMurray |
Substantially
Complete
|
Downtown Revitalization |
Fort McMurray |
Complete |
Drainage Improvements (schools and tot park) |
Parsons Creek/Brett Drive |
Active |
Drainage Improvements (Playgrounds & Outdoor Fitness Modules) |
Fort McMurray |
Active |
Flood Mitigation - Design |
Fort McMurray |
Active |
Flood Mitigation - Reaches 3 Enhancements - Design |
Fort McMurray |
Active |
Flood Mitigation - Reaches 4 Enhancements - Design |
Fort McMurray |
Active |
Flood Mitigation - Reach 5 |
Fort McMurray |
Active |
Flood Mitigation - Reach 7 |
Fort McMurray |
Complete
|
Flood Mitigation - Reach 8 |
Fort McMurray |
Substantially
Complete
|
Flood Mitigation Reach 10-1 |
Fort McMurray |
Active |
Flood Mitigation Reach 10-2 - Design |
Fort McMurray |
Active
|
Flood Mitigation Reach 11 |
Fort McMurray |
Substantially
Complete
|
Flood Mitigation - TaigaNova North - Construction |
Fort McMurray |
Active |
Flood Mitigation - Underground Enhancements |
Fort McMurray |
Active |
Flood Mitigation - Seasonal Mitigation |
Fort McMurray |
Active |
Grayling Terrace Drainage - Construction |
Fort McMurray |
Complete |
Gregoire Storm Outfall Structure - Construction |
Fort McMurray |
Active |
Landfill Closure Cells 1-3, Lateral Expansion and Old Landfill |
Fort McMurray |
Active |
Water Treatment Plant - Crossflow Clarifier Life Cycling - Construction |
Fort McMurray |
Active |
Water Treatment Plant Process Improvement Design & Construction |
Fort McMurray |
Active |
Water Treatment Plant Overflow Piping Isolation |
Fort McMurray |
Active |
Inclusive playground components replacements and additions |
Eagle Ridge, Dickinsfield, Downtown |
Substantially Complete |
King Street Booster Rehabilitation-Construction |
Fort McMurray |
Substantially Complete |
Memorial Park Signs - Pre-Design |
Fort McMurray |
Active |
Moccasin Flats Memorial |
Fort McMurray |
Active |
New Standpipe Facilities - Borealis Park |
Fort McMurray |
Active |
Northside Twin Arena - Design & Construction |
Dickinsfield |
Active |
Outdoor Rink Asphalt Surface Upgrade |
Waterways |
Active |
Partial Playground Replacement (Westview and St. Kateri) |
Thickwood/Eagle Ridge |
Active |
Playground Replacements (Dr. Clark and Ecole Boreal) |
Abasand |
Active |
2024 Playground Replacement - Design |
Fort McMurray |
Active |
Perimeter Trail - Design |
Prairie Creek |
Active |
Public Works North Facilities |
Fort McMurray |
Active |
Reflections Lookout - Construction |
Beacon Hill |
Active |
Road Surface and Alleyways Improvement |
Thickwood/Abasand |
Active |
Ryan/Hodgson Memorial Park - Design |
Beacon Hill |
Complete |
SAP Functional Improvements - Drainage |
Fort McMurray |
Active |
SAP Parks Improvements - Design |
Fort McMurray |
Complete |
Saunderson Pressure Reducing Value PRV - Construction |
Fort McMurray |
Active |
Silin Forest Road Deep Utilities Upgrades - Construction |
Thickwood |
Active |
Site Drainage Improvement Program - Design & Construction |
Fort McMurray |
Active |
Southeast Pumphouse 3rd Pump Installation |
Fort McMurray |
Active |
Spray Park Replacement Program - Design Build - KP Wong |
Fort McMurray |
Active |
Spray Park Replacement Program - Design Build - Wood Buffalo |
Fort McMurray |
Active |
Stone Creek Disk Golf |
Eagle Ridge |
Substantially Complete |
Storm/Sewer/Water Upgrades in Mackenzie/Beacon Hill - Design |
Beacon Hill |
Active |
Storm/Sewer/Water Upgrades in Mackenzie/Beacon Hill - Construction |
Beacon Hill |
Complete |
Stormwater Drainage Improvement - Construction |
Fort McMurray |
Active |
Thickwood Perimeter Sewer - Construction |
Thickwood |
Active |
Thickwood Perimeter Sewer - Design |
Thickwood |
Active |
Reservoir & Pumphouse - Design & Construction |
Timberlea |
Active |
Transit Facility (Green TRIP)-Construction |
Fort McMurray |
Substantially Complete |
Urban Arterial Boulevard Improvements & Beautification |
Fort McMurray |
Active |
Urban Infrastructure Rehabilitation Design 2019-2021 |
Fort McMurray |
Active |
TaigaNova/Abasand Lift Station Infrastructure Structural Modifications |
Fort McMurray |
Active |
Waterfront Park |
Fort McMurray |
Active |
Lift Station Replacement - Design & Construction |
Wood Buffalo |
Active |
Wood Buffalo Lift Station Replacement - Design |
Fort McMurray |
Active |
Woodlawn Cemetery Parking Lot |
Wood Buffalo |
Substantially Complete |
Wastewater Treatment Process Improvement - Design & Construction |
Fort McMurray |
Active |