Introduction:
This is an annual operation to dredge the sediments deposits at mouth of the Snye to maintain access to the channel.
Background:
The contractor will be setting up fencing at the work site and roadway (to minimize traffic flow) between August 12 to August 16. Access to the boat launches remains open during this time. The actual dredging operation begins on August 19 to August 23 and access will be restricted. The dredged materials will be temporarily placed at Snye point to allow it to dry before it is hauled to the landfill.
Proposed Start and End Dates:
August 12-September 15, 2024
Contractor:
CLH Contracting
Lead Department:
Project Management Office
Community Benefit:
Dredging will allow the watercrafts and aerodromes to safely pass through the Snye channel.
Construction Impacts
☐Temporary Water/Sewer
☒Parking & Vehicle Access
☐Garbage Pick Up
☐Driveway Interruption
☐Sidewalk Closure
☐Mailbox Relocation
☐Road or Lane Closure
☐Laydown Yard
☐Transit
☒Other
Parking lot
The parking lot is temporarily closed for public use.
Parking & vehicle access
Limited vehicle access is permitted at the discretion of the contractor or project manager if it is deemed essential.
Special Instructions for Residents
Residents are advised to take precautions and maintain safe distance during mobilization, dredging operation and transportation of materials.
For more information, please contact Pulse at 780-743-7000 or 1-800-973-9663. You can also visit rmwb.ca/construction and subscribe for updates directly to your inbox.